construction work
Track works
Elimination of several rail defects on the Wannsee > Grunewald track.
from
Monday, 07.04.2025
22:00
22:00
until
Tuesday, 08.04.2025
01:30
01:30
Affected train traffic
show details
This construction measure is taken into account in the Journey Planner
Back to details
Ahrensfelde – Potsdam Hbf
Information
- Timetable change
- Platform change
- Please use the timetable information before starting your journey.
Details
Train service
Please also note the construction work in the Friedrichsfelde Ost <> Lichtenberg area during the night of 08/09.04.(Tue/Wed).
Line alignement:
- S7 runs:
- Ahrensfelde <> Potsdam Hbf (10-minutes interval: in the night 07./08.04. (Mon/Tue) Ahrensfelde <> Westkreuz and in the night 08./09.04. (Tue/Wed) Ostkreuz <> Westkreuz)
- Timetable change:
- The S7 runs from Ahrensfelde to Potsdam Hbf 10 minutes earlier.
- In the night 07./08.04. (Mon/Tue) runs the S7 from Potsdam Hbf to Ahrensfelde 10 minutes earlier. During this night, trains travelling between Ahrensfelde <> Westkreuz are also delayed by 10 minutes.
- In the night 08./09.04. (Tue/Wed) runs the S7 from Potsdam Hbf to Westkreuz 10 minutes earlier, has in Westkreuz a 10 minutes stop and runs from Westkreuz to Ahrensfelde on shedule.
- In Wannsee, the transfer from the S1 (from Oranienburg) to the S7 to Potsdam Hbf takes 12 minutes (onward journey from the opposite platform side).
- In Wannsee, the transfer from the S7 (from Potsdam Hbf) to the S1 to Oranienburg takes 12 minutes (the onward journey is from the neighbouring platform, the station is equipped barrier-free).
- Platform change:
- In Wannsee runs the S7 to Ahrensfelde from track 2 (platform directing out of the city). In Grunewald runs the S7 to Ahrensfelde from track 2 (platform directing out of the city).